We found Blue Oak Energy's engineering capacity and communication style to be second to none.
|
Location:
Mountain View, California
System Size: 1.9 MW Energy Output: 2,611,719 kWh/year Savings: $393,000 + annually
Start Date: May 2006 |
Blue Oak Energy designed a 1.9 MW solar electric project for Google's headquarters in Mountain View, California. This extensive and architecturally complex campus required a forward thinking design solution, including both rooftop and carport PV arrays. Blue Oak acted as the projet architect and overall engineering designer and worked closely with Google and the City of Mountain View to address all site planning and design issues.