Coronal Tulare

  • Tulare County, CA
  • 44.2 MW
  • Southern California Edison

The Coronal Tulare solar farm began commercial operation in September 2016. The project delivers power through a 20-year power purchase agreement to the utility company. It is expected to generate 87,500 MWh annually, enough electricity to power more than 9,000 homes. This contiguous Coronal Tulare project includes two interconnections; the 26 MW Nicolis site was built on 144 acres and the adjacent 16 MW Tropico location spans 109 acres. Blue Oak Energy was the General Contractor for this project and performed the full engineering, permitting and construction.

Garland Solar Power Project

  • Kern County, CA
  • 272 MW
  • Southern California Edison

The Garland solar power project, which produces enough clean electricity to power approximately 50,000 homes, will deliver power to Southern California Edison (SCE) under a long-term power purchase agreement. Southern Power, a subsidiary of Southern Company, is the majority owner of the facility, which is sited on approximately 2,000 acres of land. The Garland facility uses 723,000 Canadian Solar high performance CS6X-P photovoltaic (PV) solar modules mounted on single-axis tracking tables. Blue Oak Energy was the engineering subcontractor for the General Contractor and performed all civil, structural and electrical engineering from the planning stages through final completion.

Commercial

From single office buildings to entire corporate campuses, if you are in the commercial sector, it is time to go solar.

Commercial Projects

Public Sector

Government facilities, water districts, municipalities, schools, colleges and universities are ideal locations for solar energy generation.

Public Sector Projects

Utility Scale

The fastest growing segment of the photovoltaic industry, utility scale solar is driven by government mandated Renewable Portfolio Standards.

Utility Scale Projects